Sheet Metal Fabrication RFQ Checklist: 10 Items for a Firm Quote钣金 RFQ 询价清单:10 项要素,24–48 小时拿到实价

Two enquiries with the same drawing can produce quotes that differ by more than twenty percent and arrive four days apart. The difference is rarely the factory. It is the enquiry itself. A sheet metal RFQ that arrives with a clean 3D model, a tolerance standard, a named material grade and a stated quantity takes hours to price. One that arrives as a screenshot and a "please quote" takes a week, and the number you get back is padded against everything you left undefined. Here is the RFQ pack that gets a firm quote in 24–48 hours.

Key Takeaways: Sheet Metal RFQ Checklist

  • Ten items: 3D file, 2D drawing with tolerances, material grade and temper, finish callout with cosmetic faces marked, quantity in three tiers, target price and annual volume, compliance documents, packaging and Incoterms, delivery schedule, and the decision date.
  • Step, not just DXF. A solid model settles bend count, weld joints and flat-pattern questions before anyone opens a calculator.
  • State a general tolerance standard such as ISO 2768 and then mark the few dimensions that actually matter. Blanket tight tolerances are the single biggest unnecessary cost driver.
  • Give quantity in three tiers and annual volume. Unit price is a function of lot size, tooling and setup amortisation, not generosity.
  • Ask for the compliance documents in the first email, not after the PO.

Why an incomplete RFQ package costs you days

Every missing item in an enquiry becomes a round trip. A missing material grade becomes a question. A missing finish callout becomes a guess, and the guess gets priced conservatively. Three round trips at a day each is three days of your schedule, spent before a single sheet is cut.

There is a second cost that is harder to see. When a factory cannot tell what you want, it prices the risk. A drawing with no tolerance standard will be quoted at the tightest tolerance the estimator imagines. A finish with no specified standard will be quoted at the most expensive plausible version. The pad is not dishonest — it is the only rational response to an undefined requirement. Ask two sheet metal fabrication suppliers to quote the same incomplete pack and you will get two different products priced. If you are still shortlisting, what to look for when you shortlist a fabrication partner matters more than the pack itself.

The 10-item sheet metal fabrication RFQ checklist

A complete sheet metal RFQ has ten items: a 3D model, a 2D drawing with a general tolerance standard, material grade and temper, a finish callout with cosmetic faces marked, quantity in three tiers, a target price with its constraint, compliance documents, packaging and Incoterms, the delivery schedule, and the decision date.

Item Why it matters
3D model (STEP or native) Settles bend count, weld joints and flat-pattern questions before costing starts
2D drawing with a general tolerance standard Prevents the estimator pricing to the tightest tolerance he can imagine
Material grade, temper and thickness "Stainless steel" is not a specification; grade and temper are
Finish callout with cosmetic faces marked Lets the factory route and pack around the surfaces you actually see
Quantity in three tiers plus annual volume Unit price is a function of lot size, tooling and setup amortisation
Target price with the constraint behind it Opens the trade-offs that are available and closes the ones that are not
Compliance and documentation requirements Some documents must be ordered at material-purchase time
Packaging, labelling and Incoterms The difference between parts arriving flat and parts arriving dented
Delivery schedule and the reason for it Tells the factory whether expediting or phased delivery is worth anything
Decision date and who decides The most reliable predictor of whether your enquiry gets scheduled first
Sheet metal fabrication RFQ checklist: STEP model, dimensioned 2D drawing and marked cosmetic faces for a custom enclosure

1. 3D model: STEP or native, not just a DXF

Send STEP (or a native SolidWorks / Inventor / Creo file) alongside your DXF. A solid model settles questions a flat pattern cannot: how many bends there are, where the weld joints fall, whether a flange collides with a neighbouring part, whether the flat pattern is even developable.

If all you have is a PDF or a screenshot, say so in the first line. An honest factory will tell you that a reverse-engineering step is required and quote it separately, rather than silently absorbing it and re-pricing later. A model also settles the hem, bend relief and corner joint details a flat pattern cannot show, which is where most re-quotes actually start.

2. 2D drawing with a stated tolerance standard

Your drawing needs a general tolerance framework and then explicit callouts on the dimensions that matter. State the standard — ISO 2768 class, or your own drawing note — rather than leaving every dimension untoleranced.

Then mark only the critical few: mating faces, hole patterns that must align with a purchased assembly, and sealing surfaces. Everything else rides on the general tolerance. A drawing where every dimension carries a tight individual tolerance is the single most common cause of an enclosure costing more than it should. Our sheet metal tolerance guide covers what is realistically achievable per process, and a bend allowance and flat-pattern calculator you can check the drawing against lets you sanity-check the flat pattern before you send it.

3. Material: grade, temper and thickness

"Stainless steel" is not a material specification. Neither is "aluminium." Give the grade and temper — 304 or 316L, 5052-H32 or 6061-T6, CRS or SPCC, and whether it is pre-plated or requires plating after fabrication.

Thickness matters as much: quote the base metal thickness, and say whether it is the coating-inclusive or coating-exclusive dimension. If you are still deciding, our sheet metal material selection guide maps the common grades to service environments and budget.

4. Finish callout, with cosmetic faces marked

Name the finish and, where a standard exists, the standard. "Powder coat, RAL 7035, 60–80 µm, with a chromate-free pretreatment" is a specification. "Grey powder coat" is not.

Then mark the cosmetic faces on the drawing — the surfaces a customer will actually see. Every other surface can accept normal handling marks, and knowing the difference lets a factory route and pack the part sensibly. See surface finishing options for enclosures for what is available, and our powder coating vs liquid painting comparison if you are choosing between the two.

5. Quantity in three tiers, plus annual volume

Give the prototype quantity, the first production lot, and the expected annual volume. Also state whether this is a one-off or a repeat programme.

This is not a negotiating posture. Unit price is driven by setup amortisation, nesting efficiency and whether hard tooling is justified. Three numbers let the estimator price each scenario honestly instead of guessing which one you mean. If you want to understand where the money actually goes, our custom sheet metal enclosure cost breakdown walks through the drivers, and how a prototype lot turns into a repeat production programme explains what actually changes between tier one and tier three.

6. Target price and the constraint behind it

Give the target and give the reason, because the reason is what unlocks options: "we need to land under $180 per unit at 500 pieces because the assembled product has a $900 retail ceiling." That tells the factory which trade-offs are available — a different grade, a simpler joint, a coarser tolerance — and which are not.

7. Compliance and documentation requirements

State up front what paperwork you need, because some of it has to be ordered at material-purchase time:

Asking for these after the PO has been placed is how a four-week job becomes a seven-week job. Our quality control and inspection process explains what is normally issued and when.

8. Packaging, labelling and Incoterms

Say how the parts should be packed, whether they need individual protection, what labels or barcodes they should carry, and the Incoterm. Export packaging is not a detail — it is the difference between parts arriving flat and parts arriving dented. Our export packaging and crating guide covers the options, and what the label and nameplate have to carry before it ships covers the marking side of the same conversation.

9. Delivery schedule and the reason for it

Give the required date and what it depends on — a line-down situation, a trade show, a customer audit. The reason matters because it tells the factory whether expediting is worth anything to you, and whether a phased delivery would solve your problem more cheaply than a rush. For the other side of the PO, see what actually drives enclosure lead time once the PO is placed.

10. Decision date and who decides

Say when you will award and who signs. It sounds bureaucratic; it is the single most reliable predictor of whether your enquiry gets scheduled ahead of others on the same day.

Certification, compliance and quality documents

Three documents carry most of the weight in an OEM enquiry, and each has a different lead time:

Document What it proves When to ask
Material certificate (mill cert, heat number, EN 10204 3.1) The base metal is what the drawing says Before material is purchased
First article inspection / dimensional report The first part matches the drawing At first article, not at delivery
Coating and corrosion test records The finish meets the specified standard Before the finish line is booked
RoHS / REACH declaration Substance compliance for the EU market With the enquiry, before the PO

For the last row, which certification documents the finished assembly will have to carry depends on the market and the assembly, so name it in the enquiry rather than discovering it at delivery.

Everything in the first row has to be requested when the material is ordered. If you ask at delivery, the honest answer is that traceability has to be reconstructed from purchase records, and that takes time.

Packaging, labeling and logistics

Packaging is where a good part becomes a scrap part. State the stacking limit, whether parts can nest against each other, whether painted faces need interleaving, and whether the carton or crate needs to survive a container rather than a pallet.

For export, confirm the Incoterm and who arranges the fumigation or ISPM-15 treatment if wood packaging is used. If your parts are crossing an ocean, settle the packaging method before you specify the carton — it is cheaper to fix on paper than to re-pack at the port.

How long does a sheet metal quote take?

48 hours, if the enquiry is complete on day one. This is the part buyers rarely see, and knowing it makes the pack above obvious:

  1. Triage and file check (hours 0–4). Is the model solid, is the flat pattern developable, are the files readable. Missing files stop the clock here.
  2. DFM review (hours 4–24). An engineer walks the part for manufacturability: bend radii against grain direction, weld access, fastener clearances, tolerance achievability. This is the step that prevents expensive surprises, and it is where most value is added. Our DFM design guide shows what gets flagged.
  3. Routing and costing (hours 24–36). Process routing, nesting, material yield, setup time, finish line, packing.
  4. Internal check and send (hours 36–48). Second review, then the quote goes out with any questions attached.

If your enquiry reaches step 2 in good shape, 48 hours is realistic. If it stalls at step 1, no amount of urgency will recover the time.

Copy-paste RFQ email template

Edit the brackets and send.

  1. Subject: RFQ — [part name], [quantity] pcs, decision by [date]
  2. Attachments: STEP + DXF + PDF drawing (revision [x])
  3. Material: [grade, temper, thickness]
  4. Quantity: prototype [n], first lot [n], annual volume [n]
  5. Finish: [process, colour/RAL, thickness, standard]
  6. Cosmetic faces: [which surfaces, marked on drawing]
  7. Tolerances: general [standard/class], critical dimensions marked
  8. Compliance required: [material cert / FAI / RoHS-REACH / coating test]
  9. Packaging: [individual protection / carton / crate], Incoterm [term]
  10. Required delivery: [date], because [reason]
  11. Target price: [figure], because [constraint]
  12. Decision date and approver: [date], [name]

A finishing line reading "powder coated" plus a colour code still leaves the corrosion decision unmade. Two fields close it, and neither costs anything: declare every metal present as coated, including hardware already installed, and require the coating operation to flag any feature it considers non-drainable before first piece. Both sit in the paste-ready block in the pretreatment block to paste into your RFQ.

Frequently Asked Questions

What file formats should I send for a sheet metal quote?

STEP or a native 3D file, plus a DXF flat pattern and a PDF drawing. The 3D model resolves bend count and weld access; the 2D drawing carries tolerances, notes and finish callouts.

Do I need a 2D drawing if I already have a 3D model?

Yes. A model carries geometry but not tolerances, surface finish symbols, cosmetic face definitions or weld callouts. Those live on the drawing.

How much detail is too much?

None of the ten items above is excessive. What slows a quote down is the opposite problem: a hundred individually toleranced dimensions and no general tolerance standard.

Why do quotes for the same drawing vary so much?

Usually because the enquiry left something undefined — finish, tolerance framework, or material grade — and each factory priced a different assumption. The pack above removes that variance.

Can I get a quote from a 3D model alone?

You can get a budget indication. A firm price needs the drawing, because the drawing is where the requirements that drive cost actually live.

What if I don't know which material or finish I need?

Say so and describe the service environment instead — indoor, outdoor, coastal, washdown, temperature range. A factory that does DFM will propose options with cost implications attached.

How long does a sheet metal RFQ take to quote?

24–48 hours for a complete pack, and a week or more for an incomplete one. The clock does not start when you send the email; it starts when the file check passes. Missing files, an undefined finish or no tolerance standard stop it at hour zero, and every clarification is a round trip of about a day.

Send the pack, get the number

The ten items in this sheet metal fabrication RFQ checklist take about thirty minutes to assemble, and they are reusable: once you have a template, every subsequent enclosure programme starts from a complete enquiry. Send it as a request for quotation rather than an informal email, and you will get a firm number back instead of an estimate with caveats.

Send us your STEP file and drawing for a free DFM review and a firm quote within 24–48 hours. If something in your model is going to be expensive, we will tell you which feature and what it costs before you commit.

Need a number this week? Upload your 3D model and drawing — you will get a manufacturability review and a firm price, not an estimate.

同一张图纸发出去两次询价,报价可能相差两成以上,还前后差四天。问题很少出在工厂,而出在询价包本身。一份带着干净 3D 模型、公差标准、明确材料牌号和数量的钣金询价,几小时就能算出来;一份只有截图加一句「请报价」的,要一周,而且你拿到的数字里含着对所有未定义项的加价。下面这 10 项清单,能让你在 24 至 48 小时内拿到实盘报价。

核心要点:钣金 RFQ 询价清单

  • 十项:3D 文件、带公差的 2D 图纸、材料牌号与状态、标注外观面的表面处理、三档数量、目标价与年用量、合规文件、包装与贸易条款、交付排期、决策日期。
  • 给 STEP,不只是 DXF。实体模型能在任何人打开计算器之前,先解决折弯数量、焊缝位置和展开可行性。
  • 先声明一个通用公差标准(如 ISO 2768),再单独标注真正关键的少数尺寸。全域收紧公差是最大的一笔不必要成本。
  • 数量给三档并给年用量。单价是批量、模具与调机摊销的函数,不是大方与否。
  • 合规文件要在第一封邮件里要,不要等下了采购单再要。

为什么一份不完整的询价包会吃掉你好几天

询价里每缺一项,就变成一轮往返。缺材料牌号,变成一个提问;缺表面处理标注,变成一个猜测,而猜测会按保守方式报价。三轮往返、每轮一天,就是你排期里的三天,而且是在切下第一张板之前就花掉的。

还有一笔更难看见的成本。当工厂判断不出你要什么,它就会给风险定价。一张没有公差标准的图纸,会按估算员能想到的最严公差报价;一项没写标准的表面处理,会按最贵的那个 plausible 版本报价。这份加价不是不诚实——它是面对未定义要求时唯一理性的反应。找两家钣金加工厂对同一份不完整询价包报价,你会拿到两个不同产品的价格。如果你还在筛选供应商阶段,挑选加工伙伴时该看什么比询价包本身更要紧。

10 项钣金加工 RFQ 清单

一份完整的钣金询价包含十项:3D 模型、带通用公差标准的 2D 图纸、材料牌号与状态、标注外观面的表面处理、三档数量、带约束理由的目标价、合规文件、包装与贸易条款、交付排期,以及决策日期。

项目 为什么重要
3D 模型(STEP 或原生) 在算价之前先解决折弯数量、焊缝位置与展开问题
带通用公差标准的 2D 图纸 避免估算员按他能想到的最严公差报价
材料牌号、状态与厚度 「不锈钢」不是规格,牌号与状态才是
标注外观面的表面处理 让工厂绕开你真正会看到的那些面去做流转和包装
三档数量加年用量 单价是批量、模具与调机摊销的函数
带约束理由的目标价 打开可用的权衡,关掉不可用的权衡
合规与文件要求 有些文件必须在采购材料时就下单
包装、标签与贸易条款 决定零件是平整到达还是磕碰到达
交付排期与背后原因 告诉工厂加急或分批交付对你值不值
决策日期与决策人 最能预测你的询价会不会被排在同日其他询价前面
钣金加工 RFQ 询价清单:定制外壳的 STEP 模型、带尺寸标注的 2D 图纸与已标注的外观面

1. 3D 模型:给 STEP 或原生文件,不只是 DXF

在 DXF 之外再给一份 STEP(或 SolidWorks / Inventor / Creo 原生文件)。实体模型能解决展开图解决不了的问题:一共有几道弯、焊缝落在哪里、某个翻边会不会和相邻零件干涉、这个展开到底能不能展开。

如果你手上只有 PDF 或截图,请在第一行就说明。诚实的工厂会告诉你需要先做一步逆向,并把这一步单独报价,而不是悄悄吸收、之后再重报价。模型还能定下只有实体模型才能看清的折边、折弯让位与角部接头细节,而那正是大多数重新报价真正的起点。

2. 带公差标准的 2D 图纸

你的图纸需要一个通用公差框架,再对真正重要的尺寸做单独标注。请写明标准——ISO 2768 等级,或你自己的图纸注释——而不是让每个尺寸都没有公差。

然后只标注关键的少数:配合面、必须与采购装配体对齐的孔组、密封面。其余都走通用公差。一张每个尺寸都单独收紧的图纸,是外壳成本高于应有水平最常见的原因。我们的钣金公差指南讲清了每种工艺实际能做到什么,可直接核对图纸的折弯补偿与展开计算器则让你在发出去之前先自查展开。

3. 材料:牌号、状态与厚度

「不锈钢」不是材料规格,「铝」也不是。请给出牌号与状态——304 还是 316L,5052-H32 还是 6061-T6,CRS 还是 SPCC,以及是预镀层还是成型后再镀。

厚度同样重要:请报基材厚度,并说明这个尺寸含不含涂层。如果你还在选,钣金材料选型指南把常见牌号对应到了服役环境与预算。

4. 表面处理标注,并标出外观面

写出处理名称,有标准的就写标准。「粉末喷涂,RAL 7035,60–80 µm,无铬前处理」是规格;「灰色粉末喷涂」不是。

然后在图纸上标出外观面——客户真正会看到的表面。其他表面可以接受正常的操作痕迹,知道这个差别,工厂才能合理地安排流转和包装。可选方案见外壳表面处理方案;如果在粉末与液体涂装之间选,见我们的对比分析。

5. 三档数量,外加年用量

给出样机数量、首批量产数量、预期年用量,并说明这是一次性项目还是重复项目。

这不是谈判姿势。单价由调机摊销、套料利用率以及是否值得开硬模决定。三个数字让估算员能诚实地为每个场景报价,而不是猜你指的是哪个。想知道钱具体花在哪,定制钣金外壳成本拆解逐项讲了驱动因素,样机批次如何转为重复量产项目则解释了第一档与第三档之间到底变了什么。

6. 目标价,以及它背后的约束

给出目标价,同时给出理由,因为理由才是打开选项的那把钥匙:「我们需要 500 件时单价落在 180 美元以下,因为整机零售上限是 900 美元。」这句话告诉工厂哪些权衡可以用——换个牌号、简化接头、放宽公差——哪些不行。

7. 合规与文件要求

先把你需要的文件讲清楚,因为其中一部分必须在采购材料时下单:

下采购单之后才要这些,就是把四周的活变成七周。我们的质量控制与检验流程说明了通常什么时候出什么文件。

8. 包装、标签与贸易条款

说明零件该怎么包装、是否需要单独防护、要贴什么标签或条码,以及贸易条款。出口包装不是细节——它决定了零件是平整到达还是磕碰到达。我们的出口包装与装箱指南覆盖了各种选项,发货前标签与铭牌必须承载什么则覆盖了同一件事的标识侧。

9. 交付排期,以及要这个日期的原因

给出要求日期和它的依赖——停线风险、展会、客户审核。原因重要,因为它告诉工厂为你加急到底值不值,以及分批交付是不是能比加急更便宜地解决你的问题。关于采购单另一侧的参考,见下采购单后真正驱动外壳交期的是什么。

10. 决策日期与决策人

说明你什么时候授标、谁签字。这听起来像官僚流程;它却是最能预测你的询价会不会被排在同日其他询价前面的单一指标。

认证、合规与质量文件

三份文件在 OEM 询价里承载了大部分分量,而它们的交期各不相同:

文件 它证明了什么 什么时候要
材质证书(厂证、炉号、EN 10204 3.1) 基体金属与图纸一致 采购材料之前
首件检验 / 尺寸报告 首件与图纸一致 首件时,不是发货时
涂层与腐蚀试验记录 表面处理满足规定标准 预订涂装线之前
RoHS / REACH 声明 面向欧盟市场的物质合规 随询价,下单之前

最后一行要看市场和装配体:成品装配必须携带哪些认证文件各不相同,所以请在询价里点名,而不是到发货时才发现。

第一行里的一切都必须在订购材料时就提出。如果你到发货时才要,诚实的回答是:可追溯性得从采购记录里重建,而这需要时间。

包装、标识与物流

包装是好零件变成废零件的地方。请写明堆码上限、零件之间能否相互嵌套、涂装面是否需要隔垫,以及纸箱或木箱是要撑过集装箱还是只撑过托盘。

出口时请确认贸易条款,以及如果使用木质包装,谁负责熏蒸或 ISPM-15 处理。如果你的零件要过海,请在确定纸箱之前先定包装方式——在纸上改,比在港口重新打包便宜。

一份钣金报价要多久?

48 小时——前提是询价在第一天就是完整的。这一段买家很少看到,而知道它之后,上面那份清单的存在理由就很显然了:

  1. 分诊与文件检查(第 0–4 小时)。 模型是不是实体、展开能不能展开、文件读不读得出来。缺文件,时钟就停在这里。
  2. DFM 评审(第 4–24 小时)。 工程师按可制造性走一遍零件:折弯半径与纹向、焊接可达性、紧固件间隙、公差可达性。这一步才是防止昂贵意外的环节,也是增值最多的地方。我们的 DFM 设计指南展示了哪些点会被挑出来。
  3. 工艺路线与算价(第 24–36 小时)。 工艺路线、套料、材料利用率、调机时间、涂装线、包装。
  4. 内部复核与发出(第 36–48 小时)。 二次审核,然后报价连同任何疑问一起发出。

如果你的询价能顺利进入第 2 步,48 小时是现实的。如果它卡在第 1 步,再多的催促也追不回时间。

可直接复制的询价邮件模板

改掉方括号,直接发。

  1. 主题:RFQ — [零件名称],[数量] 件,[日期] 前决策
  2. 附件:STEP + DXF + PDF 图纸(版本 [x])
  3. 材料:[牌号,状态,厚度]
  4. 数量:样机 [n],首批 [n],年用量 [n]
  5. 表面处理:[工艺,颜色/RAL,膜厚,标准]
  6. 外观面:[哪些面,已在图纸上标注]
  7. 公差:通用 [标准/等级],关键尺寸已标注
  8. 需要的合规文件:[材质证书 / 首件报告 / RoHS-REACH / 涂层试验]
  9. 包装:[单独防护 / 纸箱 / 木箱],贸易条款 [术语]
  10. 要求交付:[日期],原因是 [原因]
  11. 目标价:[数字],原因是 [约束]
  12. 决策日期与审批人:[日期],[姓名]

技术要求里只写「表面喷涂」加一个色号,腐蚀相关的关键决定其实还没有做。有两栏能把它补上,而且不增加任何成本:列出总成中所有按涂覆状态交付的金属,包括已安装的紧固件;并要求喷涂方在首件之前指出他们认为无法排液的任何结构特征。这两栏都在可直接粘贴进询价单的前处理要求条款里。

常见问题

钣金报价该发什么文件格式?

STEP 或原生 3D 文件,加一份 DXF 展开图和一份 PDF 图纸。 3D 模型解决折弯数量与焊接可达性;2D 图纸承载公差、注释和表面处理标注。

已经有 3D 模型了,还需要 2D 图纸吗?

需要。模型承载的是几何,不承载公差、表面粗糙度符号、外观面定义和焊接标注。那些东西在图纸上。

多详细算过度?

上面十项没有一项是多余的。真正拖慢报价的是相反的问题:一百个单独标注公差的尺寸,却没有通用公差标准。

同一张图纸的报价为什么能差这么多?

通常是因为询价里有什么没定义——表面处理、公差框架或材料牌号——而每家工厂按自己的假设报价。上面这份清单消除了这个方差。

只有 3D 模型能拿到报价吗?

能拿到一个预算级的价格。实价需要图纸,因为驱动成本的要求写在图纸上。

如果我还不知道要什么材料或表面处理怎么办?

直说,然后描述服役环境——室内、户外、海边、冲洗、温度范围。做 DFM 的工厂会给出带成本影响的选项。

一份钣金询价要多久才能报出来?

完整的询价包 24–48 小时;不完整的要一周甚至更久。 时钟不是从你发邮件那一刻开始的,而是从文件检查通过那一刻开始的。缺文件、表面处理未定义、没有公差标准,都会让它停在第零小时,而每澄清一次就是大约一天的往返。

发出清单,拿到数字

这份钣金加工 RFQ 清单里的十项,大概三十分钟就能凑齐,而且可以复用:一旦有了模板,之后的每个外壳项目都从一份完整询价开始。把它作为一份正式询价函而不是一封随意的邮件发出去,你拿回的就是实盘数字,而不是带一堆前提的估算。

把 STEP 文件和图纸发给我们,免费获得一次 DFM 评审和 24–48 小时内的实盘报价。如果模型里有什么地方会很贵,我们会在你下单之前告诉你是哪个特征、贵多少。

这周就要数字? 上传你的 3D 模型和图纸——你会拿到一份可制造性评审和一个实价,而不是一个估算。

Send the Pack, Get a Firm Number发出清单,拿到实盘数字

Send your STEP model and drawing. We will return a manufacturability review that names the features driving cost, the ten items we still need from you if any are missing, and a fixed-price quotation within 24-48 hours.把 STEP 模型和图纸发给我们。24 至 48 小时内回一份可制造性评审,点名驱动成本的特征、你还缺哪几项要素,以及一份固定价报价。